
Balancing Rock Work Bee
Sunday, October 4, 2026 at 9:00 a.m.
Time to tear out the old and call this project complete! We're heading to Balancing Rock Trail on Sunday, October 4 to remove the old boardwalk and pile it up for a fall burn.
Time to tear out the old and call this project complete! We're heading to Balancing Rock Trail on Sunday, October 4 to remove the old boardwalk and pile it up for a fall burn.
π Meet: Balancing Rock Trailhead at 9:00 am
π Access: Via the hydro road off the road to the CVWMA office
We'd love a couple of side-by-sides or a 4x4 with good off-road tires to help move volunteers and gear up the trail β it'll save everyone a lot of time and energy. If that's you, please let us know!
The work:
Removing staples from the grating so it can be salvaged for future use
Cutting the boardwalk into manageable sections for moving to the burn site
Piling everything up for a fall burn
Note: we do not need to remove any logs used as stringers
What to bring:
Heavy work gloves β essential
Water and a packed lunch
Rubber boots recommended β marshy ground underfoot
Chainsaw operators: ear, eye, and leg protection required
Tools needed:
Power saws β don't worry, we'll replace any chains damaged by nails or screws
Staple removal tools and pry bars
No experience needed β just show up ready to work. Many hands make light work and we always have a great time doing it.
Sign up for this event
Loading the formβ¦
Open it in a new tabTrouble with the form above? Open it in a new tab.
