Nun Creek Trail Work-Bee

    Sunday, September 20, 2026 at 8:00 a.m.

    Back to all events

    We are continuing the trail brushing work from Nun Creek to the original trailhead, approximately 2.8 km.

    Our next work bee is scheduled for Sunday, September 20 β€” continuing the trail brushing work from Nun Creek to the original trailhead, approximately 2.8 km.
    Details:
    πŸ“ Meet at the Ramada at 8:00 am β€” car-pooling from there. Back in Creston by approximately 4:00 pm. Weather dependent β€” showers are okay, rain is not.
    What to bring:
    Packed lunch and rain jacket, work gloves and suitable footwear. Plenty of water.

    Chainsaw operators: required: PPE: ear, eye, and leg protection β€” hard hat recommended.

    Brush saw operators: required: ear and eye protection.
    Equipment needed:
    Chain saws (with certification), Brush saws, Large loppers. 

    Volunteers will pick up and remove brush from the trail.
    Getting there:

    Thanks to the June work bee, the Nun Creek trailhead is now accessible by 4x4 truck if driven with care. 

    Volunteer Waiver:

    If you have completed the waiver in the past, no need to do so again - unless your information has changed. if you have not completed a TCVS volunteer waiver, please do so and follow this link: https://crestonvalleytrails.ca/volunteer

    ATVs are welcome β€” SxSs and quads.

    Please reply and let us know whether you can attend, and if you are willing to drive, need a ride, or are bringing an ATV. Your answers to the following will help up stay organized....

    Sign up for this event

    Sign up for this event